Specification

Dimensions

Weekly Rate
POA
Length
250ft.
76.2m
Width
250ft
76.2m
Depth
4ft
1.23m
Tank Size
62,500ft²
5,806m²
Volume
250,000ft
7,142m

Capacity and Additional Costs

Water Capacity
2,078,636 gal (100% filled)
9,449,671 ltr (100% filled)
Fill Time
10 days (estimate)
Empty Time
6 days (estimate)
Heated
False
Filtered
False
Labour for Filling
POA
Labour for emptying
POA

Note: All dimensions are approximate and should be checked on site prior to the commencement of works.

* Based on a working day, Monday - Friday 7am - 7pm. Additional charges will be applied outside these hours. Please be aware the Studios will test the water for contaminates that are not suitable for discharge into the main sewerage system prior to emptying the tank. Any remedial works will be the responsibility of the Production.

Deep Section Only

Length
96ft
29.3m
Width
109ft
33.2m
Depth
8ft
2.4m
Volume
83,712ft²
2,334m

Deep section only - Capacity and Additional Costs

Water Capacity
521,428 gal (100% filled)
2,370,460 ltr (100% filled)
Fill Time
4 days (estimate)
Empty Time
3 days (estimate)
Heated
False
Filtered
False
Labour for Filling
POA
Labour for emptying
POA

Note: All dimensions are approximate and should be checked on site prior to the commencement of works.

* Based on a working day, Monday - Friday 7am - 7pm. Additional charges will be applied outside these hours. Please be aware the Studios will test the water for contaminates that are not suitable for discharge into the main sewerage system prior to emptying the tank. Any remedial works will be the responsibility of the Production.

Health and Safety

The production is responsible for all activity within and around the tank. Please be advised rental of the tank excludes but not limited to the following;

  • Health and safety requirements/equipment/cover
  • Dive tank technician
  • Diving services requirements
  • Heating
  • Wave machine
  • Water Filtration
  • Water purification
  • Chemicals
  • Water surface cleaning

* Based on a working day, Monday – Friday 7am – 7pm. Additional charges will be applied outside these hours. Please be aware the Studios will test the water for contaminates that are not suitable for discharge into the main sewerage system prior to emptying the tank. Any remedial works will be the responsibility of the Production.

Filter:
marker-petrolCloseui-comparisonui-downDrivingui-externalFacebook-blackui-chevron-nextui-chevron-prevTransitTwitterYoutube-blackplus