Specification

Dimensions

Length
120ft
37m
Width
90ft
27m
Pitched Roof *highest point
26.9ft
8.2m
Pitched Roof *lowest point
19.1ft
5.8m
Stage Size
10,800ft2
999m2
All measurements are approximate and should be verified before commencement of works.

Tank Lid

Maximum Tank Decking Load (when used as a dry stage)
1,000Kg / per 10 ft2
1,000Kg / per m2

Tank Dimensions

Length
60ft
18m
Width
60ft
18m
Depth
20ft
6m
Volume
72,000ft3
2,039m3
Water Capacity
448,476 gal
2,038,515 ltr
Heated
Yes, triple gas boiler system with two heat exchangers
Filtered
Yes, UV purifcation system with automatic chemical dosing and 10 large sand filters
Chemicals
Typical frst week 32 drums of liquid chlorine and 250kg dry acid. This tends to reduce once the chemical balance is stabilised

Tank Hire Includes

Tank labour (5 days p/wk OT applies after 10 hours and 6th & 7th day),
Filling (2,500,000 liters to fill plus back-washing), heating (natural gas for initial warm up to 32°C), filtration system and chemicals (approx. 32 drums of liquid chlorine per week & 250kg dry acid powder per week).

Runway/Lifting beams

SWL - Load Between Trusses
1,102lb
500Kg

Stage doors

1x Large Dock Door
17ft 9in x 19ft 4in
5.41 x 5.88 m

Floor type

Concrete and wood

Electrical Supply

Maximum Electrical Load: AC available Load 1.5 megawatts 3Ø / 6no. x 400a powerlock sockets

Heating

Air handling units

Fire protection

Sprinkler System
93 °C
Smoke Detectors
Yes
Note: The stage is protected with a wet sprinkler system. WBSL Studio Support should be notified of any works or effects that are likely to create a high temperature.

Water

Water on stage
Yes

Voice & Data

Available
Yes
Number Of Voice/Data Outlets
20
Internet/Network Connectivity
Yes
Wireless Connectivity
Yes

D Stage Prep Information

Stage Conversion (dry/wet)
1 week
Filling Time
2 ½ days
Heating Time up to 32°
2-4 days
Tank Viewing Window
Yes

Diving

All diving requirements are booked directly between the production and the diving company of choice. Please be advised rental of the tank excludes the following;

  • Health and safety requirements/equipment/cover
  • Diving services requirements
  • Wave machine

Filter:
marker-petrolCloseui-comparisonui-downDrivingui-externalFacebook-blackui-chevron-nextui-chevron-prevTransitTwitterYoutube-blackplus